Türkiye Readies Pakistan Offshore Surveys, Signs Mining Deals

    Editorial illustration of Türkiye’s Oruç Reis seismic research vessel docked at a Pakistani port, with Turkish and Pakistani flags, officials shaking hands and symbolic gold, copper and antimony mineral displays representing bilateral energy and mining cooperation.
    Türkiye and Pakistan expand energy cooperation as the Oruç Reis vessel prepares for offshore seismic surveys and the two countries sign new agreements covering copper, gold and antimony exploration.Photo/Illustration: Bosphorus News

    Oruç Reis will survey the Indus and Makran basins as both countries target drilling in 2027 and expand copper, gold and antimony exploration

    By Bosphorus News Energy Desk

    On November 20, 2026, Türkiye's Oruç Reis seismic research vessel was preparing to survey Pakistan's offshore Indus and Makran basins from Karachi. The two countries also signed agreements on copper, gold and antimony exploration. Turkish Energy and Natural Resources Minister Alparslan Bayraktar said they aimed to begin drilling in 2027.

    Oruç Reis reached Karachi on November 19 after leaving Türkiye on October 30. Pakistan's Deputy Prime Minister and Foreign Minister Ishaq Dar and Petroleum Minister Ali Pervaiz Malik joined Bayraktar at the port ceremony. The Turkish ministry said the vessel would sail to its first survey area after final preparations. It gave no date for the start of data collection.

    Indus-C first, then Makran

    The first operation, the Marjan three-dimensional seismic project, will cover 670 square kilometres in the Eastern Offshore Indus-C Block off Karachi. Bayraktar put the planned work at 52 days.

    Oruç Reis will then return to Karachi to prepare for a second campaign in the Makran basin. The two-dimensional survey is planned along 2,353 kilometres of seismic lines and is expected to take about 25 days.

    The surveys will map geological formations and help identify potential drilling sites. Malik said he hoped the data could be collected and interpreted within six months. The partners are targeting drilling in 2027, but have announced neither a start date nor a commercial discovery. Oruç Reis gathers seismic data; it is not a drilling vessel.

    Dar pledged Pakistan's support for the mission and called for maritime safety and environmental protection. Pakistan's state broadcaster reported that he also raised cooperation on minerals and renewable energy.

    The five-block agreements predate the vessel's arrival

    The five-block agreements were signed on December 2, 2025. They cover three offshore blocks, Eastern Offshore Indus-C, Offshore Deep C and Offshore Deep F, and two onshore blocks, Ziarat North and Sukhpur-II. Mari Energies disclosed the arrangements to the Pakistan Stock Exchange the following day.

    Turkish Petroleum Overseas Company (TPOC), a subsidiary of the Turkish Petroleum Corporation (TPAO), is the operator of Indus-C. In its 2025 disclosure, Oil and Gas Development Company Limited (OGDCL) listed participating interests of 25% for TPOC, 35% for Pakistan Petroleum Limited and 20% each for OGDCL and Mari Energies. Bayraktar said on November 20 that licensing had been completed for all five blocks.

    Oruç Reis previously conducted seismic surveys off Somalia. Its Pakistan assignment extends Turkish Petroleum's overseas exploration programme.

    Copper, gold and antimony agreements

    Three mining cooperation documents followed the Karachi ceremony. MTA International Company (MTAIC), a joint venture of Türkiye's General Directorate of Mineral Research and Exploration (MTA) and Eti Maden, signed separate agreements with Mari Energies Minerals and Pakistan Mineral Development Corporation (PMDC).

    Türkiye's Energy Ministry said the agreements cover exploration at two copper-gold sites and one antimony site. MTA, MTAIC and the Geological Survey of Pakistan also signed a memorandum on geological expertise and joint projects.

    The ministry also identified potential cooperation in mining, ore processing and finished products, depending on exploration results. No processing plant or production project was announced. It linked the antimony project to Türkiye's goal of diversifying critical-mineral supplies.

    Sources: Türkiye's Ministry of Energy and Natural Resources, Pakistan's Ministry of Energy (Petroleum Division), Radio Pakistan, Mari Energies and OGDCL Pakistan Stock Exchange disclosures, Reuters, Arab News Pakistan, Bosphorus News review and reporting.

    Home